The Emergency Control Centres of the Highways Department today (March 17) conducted a drill to enhance the capability to cope with inclement weather. Photo shows staff members of a contractor clearing storm water drains inside a temporarily closed road tunnel before the drill to ensure they are free from blockage.
Close