Footbridge near MTR Kowloon Bay Station Exit A
Project Description:
To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit A in order to alleviate the congestion at the existing footbridge near the exit and enhance connectivity between the MTR Station and the nearby residential areas.
Estimated Project Cost: :
HK$175.8 Million
Construction Commencement Date:
7/2022
Anticipated Commissioning Date:
7/2025
Contract(s):
Contract No. HY/2022/04
Scope | To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit A and Lower Ngau Tau Kok Estate with associated ramp and staircase. |
Commencement Date | July 2022 |
Anticipated Completion Date |
July 2025 |
Contract Sum | HK$130.20 Million |
Contractor | Kuly Construction & Engineering Company Limited |
Resident Engineer | WSP (Asia) Limited |
Consultant:
WSP (Asia) Limited