Footbridge near MTR Kowloon Bay Station Exit A

Project Description:

To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit A in order to alleviate the congestion at the existing footbridge near the exit and enhance connectivity between the MTR Station and the nearby residential areas.

Estimated Project Cost: :

HK$175.8 Million

Construction Commencement Date:

7/2022

Anticipated Commissioning Date:

7/2025

Contract(s):

Contract No. HY/2022/04

Scope To construct a footbridge across Kwun Tong Road and connect to MTR Kowloon Bay Station Exit A and Lower Ngau Tau Kok Estate with associated ramp and staircase.
Commencement Date July 2022
Anticipated Completion
Date
July 2025
Contract Sum HK$130.20 Million
Contractor Kuly Construction & Engineering Company Limited
Resident Engineer WSP (Asia) Limited

Consultant:

WSP (Asia) Limited