Hiram's Highway Improvement Stage 2

Project Description:

To improve the section of Hiram's Highway, Po Tung Road and Tai Mong Tsai Road from Marina Cove to the south of Sha Ha.

The proposed improvement works will relieve the existing traffic congestion and cope with the anticipated traffic growth, as well as to enhance the resilience of the concerned roads to cope with unforeseen situation.

Estimated Project Cost: :

HK$ 2.75 Billion

Commencement Date:

24 December 2024

Anticipated Commissioning Date:

2032

Contract(s):

Contract No. HY/2023/12

Scope Widening of the section of HH from Marina Cove to Sai Kung Town and Po Tung Road of approximately 4 kilometers in length and improvement of a section of Po Tung Road and Tai Mong Tsai Road of approximately 600 m in length between Fuk Man Road and Wai Man Road.
Commencement Date 24 December 2024
Anticipated Completion Date 2032
Contract Sum HK$ 2.19 Billion
Contractor China State – AICL – CSCEL Joint Venture
Resident Engineer WSP (Asia) Limited

Constultant:

Other Related Information: