Tuen Mun – Chek Lap Kok Link (TM-CLKL)
Project Description:
The TM-CLKL provides the most direct route between the Northwest New Territories and Hong Kong – Zhuhai – Macao Bridge (HZMB), the Airport and North Lantau and also an alternative route to the Airport.
The Northern Connection of TM-CLKL connects Tuen Mun Area 40 with the HZMB Hong Kong Port (HKP) via a sub-sea tunnel. The Southern Connection connects the Hong Kong Port and North Lantau on viaducts.
Estimated Project Cost:
- Detailed design, site investigation and advance works - HK$1.91 Billion
- Construction works - HK$44.8 Billion
Construction Commencement Date:
- Advance works - Nov 2011
- Ground investigation works - May 2012
- Construction works - Jun 2013
Commissioning Date:
Southern Connection
- Mainline (the section between the Hong Kong Port and the North Lantau Highway (urban bound)) - was opened to the public on 24 October 2018 to tally with the commissioning of the Hong Kong-Zhuhai-Macao Bridge
- The section between the Hong Kong Port and the North Lantau Highway (Tung Chung bound) - was opened to the public on 30 November 2018
Northern Connection
- The Northern Connection of TM-CLKL – was opened to the public on 27 December 2020
Contract(s) :
Contract No. HY/2010/02
Scope | Construction of an artificial island of about 150 hectares (ha), of which about 130 ha is for the Hong Kong Port and about 20 ha is for the southern landfall of the TM-CLKL. |
Commencement Date | Nov 2011 |
Completion Date | TM-CLKL southern landfall reclamation - Mid 2017 |
Contract Sum | HK$6.99 Billion |
Contractor | China Harbour Engineering Company Limited |
Resident Engineer | Ove Arup & Partners Hong Kong Limited |
Contract No. HY/2012/04
Scope | Ground investigation works for the TM-CLKL |
Commencement Date | May 2012 |
Completion Date | Nov 2013 |
Contract Sum | HK$137 Million |
Contractor | Gammon Construction Limited |
Resident Engineer | AECOM Asia Company Limited |
Contract No. HY/2012/07
Scope | Construction of a dual 2-lane elevated carriageway between the Hong Kong Port and North Lantau Highway (NLH) with associated slip roads, as well as modifications and realignment of sections of the NLH and Cheung Tung Road at North Lantau, and associated works. |
Commencement Date | Jun 2013 |
Completion Date | Nov 2018 |
Contract Sum | HK$8.66 Billion |
Contractor | Gammon Construction Limited |
Resident Engineer | AECOM Asia Company Limited |
Contract No. HY/2012/08
Scope | Construction of a dual 2-lane sub-sea tunnel of about 5 km long between Tuen Mun Area 40 and the Hong Kong Port and reclamation of about 16.5 ha at Tuen Mun Area 40. |
Commencement Date | Aug 2013 |
Completion Date | The TM-CLKL Northern Connection was opened to the public on 27 December 2020 |
Contract Sum | HK$18.2 Billion |
Contractor | Dragages-Bouygues Joint Venture |
Resident Engineer | AECOM Asia Company Limited |
Contract No. HY/2013/12
Scope | Construction of a toll plaza of approximately 5.4 hectares and associated structures, carriageways and footbridge, as well as modification and realignment of sections of Lung Mun Road and Lung Fu Road at Tuen Mun, and associated works. |
Commencement Date | July 2014 |
Completion Date | The TM-CLKL Northern Connection was opened to the public on 27 December 2020 |
Contract Sum | HK$3.05 Billion |
Contractor | CRBC – KADEN Joint Venture |
Resident Engineer | AECOM Asia Company Limited |
Contract No. HY/2017/10
Scope | Construction of administration building, main control building and ancillary buildings and facilities and E&M works for the TM-CLKL Northern Connection. |
Commencement Date | May 2018 |
Completion Date | The TM-CLKL Northern Connection was opened to the public on 27 December 2020 |
Contract Sum | HK$2.59 Billion |
Contractor | Gammon Construction Limited |
Resident Engineer | AECOM Asia Company Limited |
Contract No. HY/2014/10
Scope | Design, supply and installation of a traffic control and surveillance system for the TM-CLKL Northern Connection. |
Commencement Date | May 2018 |
Completion Date | The TM-CLKL Northern Connection was opened to the public on 27 December 2020 |
Contract Sum | HK$158 Million |
Contractor | GTECH Services (Hong Kong) Limited |
Resident Engineer | AECOM Asia Company Limited |
Consultant:
AECOM Asia Company Limited — investigation and preliminary design of TM-CLKL
AECOM Asia Company Limited — design and construction of TM-CLKL
Other Related Information :
- Environmental Monitoring & Audit Information
- Gazettal Documents