Lift and Pedestrian Walkway System between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung
Project Description:
A lift system with two inclined lifts will be constructed under the Project so as to provide a comfortable, convenient, safe, environmentally friendly and barrier-free pedestrian facility to the locals, facilitating the elderly and those in need to travel up and down the slope between Tai Wo Hau Road and Wo Tong Tsui Street.
Estimated Project Cost:
HK$249.4 Million
Construction Commencement Date :
February 2019
Anticipated Commissioning Date
April 2022
Contract(s):
Contract No. HY/2018/09
Scope | construction of a covered inclined lift system of about 40 metres in length with 2 inclined lifts connecting Tai Wo Hau Road and Wo Tong Tsui Street; and ancillary works including associated geotechnical, road, drainage, utilities, landscaping, public lighting, and electrical and mechanical (E&M) works, etc. |
Commencement Date | February 2019 |
Anticipated Completion Date | April 2022 |
Contract Sum | HK$109.98 Million |
Contractor | HY-GE Joint Venture |
Resident Engineer | Mannings (Asia) Consultants Limited |
Consultant:
Mannings (Asia) Consultants Limited