Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung
Project Description:
To provide a comfortable, convenient, safe, environmentally friendly and barrier-free pedestrian access to the locals, facilitating the elderly and the disabled to travel between Shek Lei area, Castle Peak Road – Kwai Chung and Kung Yip Street.
Estimated Project Cost:
HK$584.4 Million
Construction Commencement Date :
December 2019
Anticipated Commissioning Date
1st quarter of 2024
Contract(s):
Contract No. HY/2019/02
Scope | To construct a lift and pedestrian walkway system connecting Shek Lei area, Castle Peak Road – Kwai Chung and Kung Yip Street |
Anticipated Commencement Date |
December 2019 |
Anticipated Completion Date | 1st quarter of 2024 |
Contract Sum | HK$284.09 Million |
Contractor | Build King Civil Engineering Limited |
Resident Engineer | WSP (Asia) Limited |
Consultant:
WSP (Asia) Limited