Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 6 - Contract 1

Walkway No. NF314 - Across Tuen Mun River Channel opposite to Lung Mun Oasis and Glorious Garden

Walkway No. NF343 - Across the Junction of Tai Ho Road and Sha Tsui Road
Contract No.
HY/2020/23
Scope:
Construction of 23 lifts at 13 existing footbridges and one existing subway in Tsuen Wan and Tuen Mun Districts.
[List of Lift Retrofitting Works]
Commencement Date:
July 2021
Anticipated Completion Date:
July 2025
Contract Sum:
HK$241.5 Million
Contractor:
China National Chemical Engineering Group Corporation Ltd
Resident Engineer:
Mannings (Asia) Consultants Limited
Consultant:
Mannings (Asia) Consultants Limited