Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways - Package 7 Contract 2

Walkway No. K&T04 - Across Kwai Yan Road near Metroplaza

Walkway No. SK03 – Across King Ling Road near Hong Kong Design Institute
Contract No.
HY/2022/12
Scope:
Construction of 47 lifts at 31 existing walkways in Central and Western, Kowloon City, Kwai Tsing, Kwun Tong, Wong Tai Sin, Sai Kung, Southern and Yau Tsim Mong Districts, a walkway cover of about 100 metres long connecting United Christian Hospital at footpath of Sau Mau Ping Road Westbound and a covered elevated walkway of about 50 metres long connecting a proposed lift tower for the existing footbridge (Structure no. KT06) to Sau Ming Road Park.
[List of Lift Retrofitting Works]
Commencement Date:
July 2023
Anticipated Completion Date:
July 2026
Contract Sum:
HK$940.7 Million
Contractor:
Build King – Richwell Engineering Joint Venture
Resident Engineer:
WPS (Asia) Limited
Consultant:
WPS (Asia) Limited