Road Resurfacing Works under Construction

(as at 30 September 2024)

Table in .xlsx format

Location Area
(sq.m)
Road
Length
(m)
Estimated
Cost
($M)
Actual
Commencement
Date
(month/year)
Anticipated
Completion
Date
(month/year)
Contract
No.
Junction of Tai Chung Kiu Road and Fo Tan Road 8,500 570 7.00 08/2022 12/2024 03/HY/2023
Junction of Tai Chung Kiu Road and Sha Tin Wai Road 6,000 400 5.80 12/2021 12/2024 03/HY/2023
Ma Tin Road (Section Between L/P: DD1877 and BD1373) & Shap Pat Heung Road (Section Between L/P: BD1433 and BD1440) 3,900 450 1.10 03/2023 12/2024 04/HY/2020
Siu Lek Yuen Road (Westbound)
(between Sha Tin Wai Road and Chap Wai Kon Street)
3,600 350 2.90 11/2022 12/2024 03/HY/2023
Tai Lee Street, Yuen Long Tai Hang Street, Yuen Long Tai Cheung Street and Shui Che Kwun Street 4,200 400 2.00 02/2023 12/2024 04/HY/2020
Tai Tong Road
(from L/P FC1274 to FC1290 & FB4387 to AD7849)
6,000 850 2.60 07/2022 12/2024 04/HY/2020
Wang Lok Street & Wang Lee Street
(Section between L/P H4923 to FA8675)
6,000 1,030 2.40 02/2023 12/2024 04/HY/2020
Tin Ha Road
(Section between L/P FB9082 to GD0066 & L/P FB9104 to GD0586)
5,000 850 2.00 06/2023 12/2024 04/HY/2020
Tai Kei Leng Road
(between L/P FB1190 to AD7845) 67NRU71K
4,000 575 1.15 06/2023 12/2024 04/HY/2020
Tsing Yi Road
(between L/P FC1008 and GC1260)
5,000 360 2.88 01/2024 12/2024 05/HY/2020
Tai Lam Chung Road
(between L/P CD1946 and FB4894)
3,000 800 0.90 01/2024 04/2025 04/HY/2020
Wu Kau Tang Road 9,600 1,050 4.90 06/2024 10/2024 07/HY/2021
LION ROCK TUNNEL ROAD, SOUTH AND
NORTH BOUND, TOLL PLAZA
15,500 560 7.79 06/2024 12/2024 05/HY/2018
Tsing Tsuen Road
(between L/P CC0809 and FB3178)
4,800 550 2.53 06/2024 03/2025 05/HY/2020
Junction of Tuen Hi Road Tuen Hing Road 1,200 400 0.55 09/2024 12/2024 04/HY/2020
Wai Tsuen Road
(between L/P W1961 and FA5854)
2,200 200 1.20 08/2024 11/2024 05/HY/2020
Shing Mun Tunnel Road (South Bound)
CH4.2 TO CH3.3, Full Width
11,500 900 5.98 07/2024 10/2024 05/HY/2018
Tolo Highway (North Bound), CH14.70 to CH15.55, Full Width 13,700 850 5.85 07/2024 10/2024 05/HY/2018
FANLING HIGHWAY
(i) South bound, CH25.95 to CH26.82, lane 3 and lane 2 and
(ii) South bound, CH25.75 to CH25.95, lane 3 and half of lane 2
9,200 1,070 3.76 07/2024 10/2024 05/HY/2018
Rehabilitation of Flexible Pavement - Ex-toll Plaza of Shing Mun Tunnel, West Bound 10,000 510 4.36 06/2024 12/2024 08/HY/2021
Rehabilitation of Flexible Pavement - Ex-toll Plaza of Shing Mun Tunnel, East Bound 11,500 620 5.00 07/2024 12/2024 08/HY/2021
Tsing Yi Heung Sze Wui Road
(between L/P FC3536 and FC1029)
7,500 350 5.55 07/2024 12/2024 05/HY/2020
Fung Shue Wo Road
(between L/P FB6646 and W4058)
5,500 700 4.02 09/2024 10/2024 05/HY/2020
Kwai Chung Road
(between L/P FA6083 and FA6069)
4,500 800 3.90 09/2024 10/2024 05/HY/2020
Waterloo Road (Northbound)
from Nathan Road to Dunas Street
4,800 420 3.20 10/2022 12/2024 12/HY/2019
Lee On Road from Lamp Post no. AB0036 to AF0300 4,000 340 2.08 10/2023 10/2024 05/HY/2017
Nga Cheung Road (southbound) between Jordan Road and Austin Road West 4,200 500 3.67 12/2023 03/2025 12/HY/2019
Hing Wah Street West Bothbound on Bridge K88 8,500 940 8.00 05/2024 02/2025 12/HY/2019
Clear Water Bay Road from Lamp Post no. BF2939 to BF2944 3,400 245 1.80 03/2024 02/2025 05/HY/2017
Hing Wah Street West (From L/P AA 8215 to L/P AA 8482) 3,850 180 3.00 03/2023 03/2025 12/HY/2019
Hoi Fai Road near Sham Mong Road 1,600 200 1.80 04/2024 12/2024 12/HY/2019
Eastern Harbour Crossing (EHC), North Bound, Toll Plaza 9,500 1,000 7.98 03/2024 12/2025 02/HY/2023
West Kowloon Corridor Eastbound (between L/P AA9204 and L/P AA9410) 4,700 465 2.76 08/2023 03/2025 12/HY/2019