EN
繁
简
Bahasa Indonesia
हिंदी (Hindi)
नेपाली (Nepali)
ਪੰਜਾਬੀ (Punjabi)
Tagalog
ภาษาไทย (Thai)
اردو (Urdu)
Tiếng Việt (Vietnamese)
A
A
A
24-hour Hotline
2926 4111
About Us
Welcome Message
Organisation
Vision and Mission
Management Policy
Performance Pledge
Core Business
Recognition and Awards
Consolidated Annual Open Data Plans (Spatial Data Plans included)
Information
Corner
What's New
Press Release
Letters to Editors
Special Finance Committee Meetings
Fact Sheets of our Work
Innovations
Public Engagement Events
Research and Development
Gallery and Videos
Trivia
RSS Feed
Tender
Notices
Engineering Contracts
Engineering Consultancies
Others
Road and Railway
Networks
Road Network
Railway Network
Our
Projects
Road Projects
Railway Projects
Walkability Projects
Retrofitting of Noise Barrier Projects
Our
Services
Road Maintenance and Improvement
Slope Maintenance and Improvement
Structures Maintenance
Streetscape Enhancement & Vegetation Maintenance
Lighting Maintenance and Enhancement
Excavation Management
Technical
References
Technical Documents
Standard Drawings
Others
Service
Enquiries
Access to Information
Enquiries and Complaints
Public Forms
Electronic System for Public
Electronic Systems for Works Partners
Home
Technical References
Technical References
Excavation Permit Processing Manual
Related Documents
Related Documents
Related Documents
File Type
Colour of Underground Facilities
Good Practices in Preparation of TTM Submissions
Guideline on Permit Period Assessment for Road Excavation Works
Simplified Guidelines for Infrequent Excavation Permit Applicants
-
Land (Miscellaneous Provisions) Ordinance
-
G.N. 6692 Land (Miscellaneous Provisions) Ordinance (Chapter 28) - (Notice of designation of strategic street, sensitive street and remaining street under section 10U(1))
Chinese Version
G.N. 5802 Land (Miscellaneous Provisions) Ordinance (Chapter 28) - (Notice under section 18C(1)(a) for specification of time limit for submission of an application for the issue of an excavation permit and the extension of the period for which an excavation permit is valid)
Chinese Version
G.N. 1626 Land (Miscellaneous Provisions) Ordinance (Chapter 28) - (Notice under section 18C(1)(b) for specification of classes of streets as newly constructed street and the duration for which such classes of streets shall not be used for any excavation)
Chinese Version
List of Emergency Excavations
Conditions of Permits
-
Approved Work List for Exemption from Submission of the Test Certificate/ Report
Approved Work List for Exemption from Temporary Decking over Excavation not being Worked On
UTLC Papers
-
Guidance Notes RD/GN/018A - Minor Works Specification for Bituminous Materials
Guidance Note on Applications for Excavation Permits for Supply of Electricity for 2-storey Warehouses in Non-residential or Rural Areas
Code of Practice for the Lighting, Signing and Guarding of Road Works
-
List of Standard Reasons for Idle Site
Dig Permit Procedures for Excavation Works in Penny's Bay Development Area
Supplementary Procedures (Nov07)
Attachment A-1 (Jun05)
Attachment A-2 (Jun05)
Attachment A-3 (Jun05)
Attachment A-4 (Jun05)
Attachment B-1 (Nov07)
Attachment C-1 (Jun05)
Attachment C-2 (Jun05)
Attachment C-3 (Jun05)
Attachment D-1 (Jun05)
Attachment E-1 (Nov07)
Attachment F-1 (Jun05)
Attachment F-2 (Jun05)
Attachment G-1 (Jun05)
Attachment H-1 (Jun05)
Detailed Requirements on Support of Utility Services
Support of Utility Services 2007.doc
Attachment 1 - HEC - General Practice 2010 (Chinese)
Attachment 1 - HEC - General Practice 2010 (English)
Attachment 1 - HEC - Leaflet 2010 (Chinese)
Attachment 1 - HEC - Leaflet 2010 (English)
Attachment 1 - HEC - Photos (reduced).doc
Attachment 2 - CLPP - Contractors Working in Vicinity to Electricity Cables & OHLs_Chinese Guidelines
Attachment 2 - CLPP - Contractors Working in Vicinity to Electricity Cables & OHLs_English Guidelines
Attachment 2 - CLPP - Photos
Attachment 3 - DSD - Photos (reduced)
Attachment 4 - HyD - hldsdge01-cl0003C
Attachment 4 - HyD - hldsdge01-cl0005C
Attachment 4 - HyD - ldsdge01-cl0022B
Attachment 5 - HKBN - Photos (reduced)
Attachment 6 - HKC - Photos
Attachment 6 - HKC - TMSC01
Attachment 6 - HKC - TMSC02
Attachment 6 - HKC - TMSC03
Attachment 7 - HKTL - Drawings
Attachment 8 - HGC - Guideline for Support of HGC External Plant
Attachment 8 - HGC - Photos
Attachment 9 - NWT - Drawings of Supporting Method
Attachment 9 - NWT - Photos (reduced)
Attachment 10 - PCCW - EXUG167-9
Attachment 10 - PCCW - Photos
Attachment 11 - HKCG - General Requirements For Construction Work In The Vicinity Of Gas Main
Attachment 11 - HKCG - Get All Safe
Attachment 11 - HKCG - Photos
Attachment 12 - TGT - Photos
Attachment 12 - TGT - Plant supporting Requirement
Attachment 13 - WSD - How to Prevent Damage to Water Mains
Attachment 13 - WSD - Photos
Attachment 13 - WSD - Support
Attachment 14 - WTT - Photos (reduced)